In 1851, the construction of the branched narrow-gauge railway network with the spacing of 785 mm, i.e. 30 Prussian inches, was started in Upper Silesia. First sections were passable as early as two years later. To this date, a 21-km section was left.
Upper Silesian Narrow-Gauge Railways
Górnośląskie Koleje Wąskotorowe
Reja
41-902 Bytom
Poland
+48 (0) 666 - 904142
Homepage